| Plant |

Development Room
Adopt CAD
design concept, which promotes product sales. |

Inspection Workshop
Complete inspection equipments for bicycle frames to ensure
that product quality reaches management expectancy. |

Argon arc welding
Operators all hold national operating certificates
approved, and use Japanese argon arc welding machine to manufacture
high quality argon arc welding bicycle frame. |

Automatic welding machine for brazed
joint bicycle frame
Adopt infrared temperature controller to control
welding temperature in order to ensure welding quality of brazed
joint bicycle frame. |

Surface treatment
Treatment before painting metal material adopts
automatic flow line to ensure steady quality. |

Coating workshop(1)
Adopt Lan's static spray booth and infrared
baking oven system to produce high quality painting products. |

Coating workshop(2)
|

Bicycle
frame assembly
Adopt mechanized
operation to ensure assembling precision and strength. |

Whole bicycle assembly
Carry out
strict inspection for each workshop to ensure that assembling
quality reaches the requirements. |

Logistics warehouse
Newly build(built) container logistics warehouse
with 3000 square meters.” |